March 15, 2010              Login  
 
 
 
ProjectsCompleted ProjectsSPOL     
SOUTH PARS GAS FIELD DEVELOPMENT OIL LAYER (SPOL) Minimize
 
Client/ Contractor: PETRO IRAN Co. / SAFF Co.
Scope of Work
Project Management Consultancy (PMC) for engineering services comprising of Basic, Detail & Follow up Engineering The PMC of detail engineering comprises of a full range of project control and coordination services throughout detail engineering and review of issuing all of detail design documents. (i.e. AFC drawings, HAZOP report, MTO, material requisition and technical bid evaluations). These services include provision of personnel, systems, methods and procedure to support the PMC work.
Brief Description

The south pars field is located in the Persian Gulf approximately 100 km south-west of Assaluyeh and 175 km west of Kish island. The south pars oil field development will be executed in two phases. The first phase will consist of up to 7 production wells and will utilize a dedicated floating production facility (FPSO). For this phase one Wellhead platform will be installed. The design wellhead platform capacity will be 44,000 BLPD. The analysis of the profiles results that the design capacity is given by the production foreseen in August 2008 and corresponding to: Liquid Rate: 44,000 BLPD (35,000 bbl of oil and 9,000 of water).

 
 
 
Company News Minimize
 
 
 
Last News(RSS) Minimize
 
 
 
Related Links Minimize
 
 
 
  Copyright ® 2009 Saff-rosemond Co.   Terms Of Use  Privacy Statement