SPD12E WH JACKET SOUTH PARS GAS FIELD DEVELOPMENT
 
Owner / Client: NIOC / Petropars
EPCI Contractor: Sepehr-Rosemond
Engineering Subcontractor: Saff-Rosemond Engineering and Management Company
Scope of Work
The scope of work of Saff Rosemond Engineering Management Co. as the engineering subcontractor for the project is: Basic and Detail Engineering, Procurement Engineering, Fabrication and Installation Engineering and Follow up Engineering of one Wellhead Jacket and a Temporary Drilling Deck.
Brief Description

The SPD12E Wellhead Platform Jacket of South Pars Gas Field Development Phase 12 is to be installed at a location approximately 100Km offshore south west of Assaluye in Persian Gulf. The platform’s Jacket is a four-legged structure for water depth of 71.5 meters with leg spacing of 20 x 24 m at working point EL + 5.600 m. The jacket is to supports topside with an approx. weight of 2750 tonnes. The jacket supports 15 x 26” conductors located in the wellbay at the global north west or north face of the jacket. These 15 conductors in the wellbay are accessible by jack-up drilling ring from the north side of platform. The jacket has four vertical frames and five plan bracing levels at EL +3.600, -13.400, -32.400, -52.400 and -71.500m. The Jacket is a launch installed type. Four Ø60’’piles will be driven through the legs.

 
 
 
Last News(RSS) Minimize
 
 
 
Related Links Minimize
 
 
 
Company News Minimize
 
 
 
  Copyright ® 2009 Saff-rosemond Co. Last Update 2010,November   Terms Of Use  Privacy Statement