February 7, 2012              Login  
 
 
 
ProjectsCompleted ProjectsLaunch Barge     
Launch Barge Project Minimize
 
Client/ Contractor: Sadaf Co.
Scope of Work
Saff-Rosemond scope of work is comprised of two parts:
  • Engineering (Basic design, Detail design, Procurement eng., Class approval, Workshop drawings and As-built drawings)
  • Project Management Concultancy(PMC) (planning, procurement and material management, construction supervision, commissioning supervision and completion)
Brief Description

7000 DWT Deck Cargo Barge (DAY 7000) is an unmanned dump barge suitably equipped for carrying deck cargo for the Persian Gulf and Oman Sea area. The vessel to fully comply with the applicable requirements of the classification society, IMO and other regulatory bodies and to obtain all applicable certificates. The ship is built in welded steel provided with one (1) flush deck and without twin skeg. Skeg is not considered for this barge instead, aft profile is changed to cubic form to have more buoyancy for load-out applications. The main hull is divided by seven (7) transverse W.T. bulkheads and three (3) longitudinal W.T. bulkheads into thirty-two (32) compartments.

Launch barge manufacturing finished
Launch barge manufacturing terminated in Saff yard at Nov 2010 and was launched to sea by air bag method. Its design started at Nov 2009 and had been approved by GL.
 
 
Company News Minimize
 
 
 
Last News(RSS) Minimize
 
 
 
Related Links Minimize
 
 
 
  Copyright ® 2009 Saff-rosemond Co. Last Update 2010,November   Terms Of Use  Privacy Statement