Installation of SPOL Minimize
 
Client/ Contractor: PEDCO / SAFF Co.
Scope of Work
Scope of work of this project is Installation Engineering of South pars Oil Layer (SPOL) Offshore Wellhead Platform based on the project specific requirements and its extent is as follow:
  • Preparing Jacket Installation procedure
  • Review and Endorsement of the Jacket Lift and Transportation Analysis
  • Jacket Rigging and pad eye Design
  • Pile/Wellhead Sea fastening and Pad eye Design
  • Pile Drivability
  • Installation Aid MTO
  • Jacket/Pile and Wellhead Installation Drawings
Brief Description

The South Pars Field is located in the Iranian sector of the Persian Gulf, approximately 100 km south-west of the Iranian coast. The South Pars Oil Field Development will be executed in two phases; the First Phase will consist of up to 7 production wells and will utilize a dedicated floating Production Facility (FPSO). For Phase I, one new production and water injection (future) Wellhead Platform will be installed. The following number of wells shall be foreseen:

  • Production Wells n° 7
  • Water Injections Wells n° 2 (future)
  • Spare Slots (for production) n° 3

Individual flow lines will transport reservoir fluids from each Christmas tree to a production manifold on Wellhead Platform and then via flexible piping to an FPSO (Production Facilities), for stabilization, dewatering, desalting and finally to be exported via shuttle tankers. The design wellhead platform capacity will be 44,000 BLPD. The analysis of the profiles results that the design capacity is given by the production foreseen in August 2008 and corresponding to:

  • Gas Rate: 801 Sm3/day (28,305 MSft3/day)
  • Liquid Rate: 44,000 BFPD (35,000 bbl of oil and 9,000 of water).
 
 
 