May 20, 2012
Login
Web
Site
Home
Staff & Facilities
Organization Chart
Service
Feasibility Study & Feed Engineering
Basic Engineering
Detail Engineering
Installation Engineering
Procurement & Construction Engineering
Project Management Consultancy
Commissioning and Start-up Assistance
Projects
Current Projects
FARZAD – A WELLHEAD JACKET
SPD12E
Jack Up Drilling Units
AHL-3200
Hengam
Arash
Bahregansar
PHASE 15
LAVAN
Gachsaran
Sirri Water Injection
Cable Laying Barge
Completed Projects
SPOL
INSTALLATION OF SPOL
Installation phase 15
New SWIP
Launch Barge
Aboozar
Quality & HSE
Quality & HSE
Quality Certificate
Contact Us
Job Vavancy
Projects
Current Projects
Cable Laying Barge
Cable Laying Barge
Client/Contractor:
SADAF Co.
Scope of Work
Saff-Rosemond scope of work is comprised of two parts:
Engineering (Basic design, Detail design, Procurement eng., Class approval)
Project Management Consultancy (PMC) (planning, procurement and material management, construction supervision, commissioning supervision and completion)
Brief Description
The vessel is to fully comply with the applicable requirements of the classification society, IMO and other regulatory bodies and to obtain all applicable certificates. Barge equipped with following facility for activity at Persian Gulf and Oman Sea area:
Cable laying equipment
Geo-technique tools
Accommodation suitable for 100 people co which enables barge for commissioning and any operation at sea.
The ship is built in welded steel provided with one (1) flush deck and without twin skeg. The main hull is divided by six (6) transverse watertight bulkheads and two (2) longitudinal watertight bulkheads into twenty-one (21) compartments.
Main Description
LENGTH OVERALL
74.50 m
LENGTH B.P
71.52 m
BREADTH
21.60 m
DEPTH
4.00 m
DRAFT
2.73 m
SPEED
8 Kn
GROSS TONNAGE
2279
NET TONNAGE
684
Cable Laying Vessel’s structure fabrication is finished(28, March, 2011)
Cable Laying Vessel’s hull structure fabrication has been finished and the yard construction team is going to start its piping work and machinery installation. Below are some pictures of the vessel during construction of the hull.
Company News
Job Vavancy(04/09/2011)
Cable Laying Vessel’s structure fabrication is finished(28, March, 2011)
Celebrating the onset of Rosemond-SA20 Jack up Drilling Rig Construction Phase
Jack-up drilling unit patent registration by Saff-Rosemond Company…
Asian Gas Network
Launch barge manufacturing finished
Last News(RSS)
Related Links
Rosemond Group Holding Co.
Sepehr-Rosemond Co.
Petro-Rosemond Co.
Saff offshore industries Co.
SADAF Co.
SABA Co.
Bareen International Drilling Company
Home
|
Staff & Facilities
|
Service
|
Contact Us
|
Job Vavancy
Copyright ® 2009 Saff-rosemond Co. Last Update 2010,November
Terms Of Use
Privacy Statement