February 7, 2012              Login  
 
 
 
ProjectsCurrent ProjectsPHASE 15     
SOUTH PARS GAS FIELD DEVELOPMENT PHASE 15 OFFSHORE FACILITIES PROJECT Minimize
 
Client/ Contractor: POGC/ SAFF Co.
Scope of Work
Project Management Consultancy (PMC) for engineering services comprising of Basic, Detail & Follow up Engineering. The PMC of detail engineering comprises of a full range of project control and coordination services throughout detail engineering and review of issuing all of detail design documents. (i.e. AFC drawings, HAZOP report, MTO, material requisition and technical bid evaluations). These services include provision of personnel, systems, methods and procedure to support the PMC work.
Brief Description

The south pars field is located in the Persian Gulf approximately 100 km south-west of Assaluyeh and 175 km west of Kish island. POGC as client is developing phase 15 of the field which will allow gas production of 1000 MMSCFD. The offshore facilities include:

  • One Wellhead platform
  • One intermediate support platform
  • Two bridges
  • One remote flare platform
 
 
 
Company News Minimize
 
 
 
Last News(RSS) Minimize
 
 
 
Related Links Minimize
 
 
 
  Copyright ® 2009 Saff-rosemond Co. Last Update 2010,November   Terms Of Use  Privacy Statement