LAVAN SUBMARINE POWER CABLE PROJECT
|
 |
|
 |
| |
| Client/ Contractor: Iranian Offshore Oil Co. (IOOC)/ Sadaf Co. |
| Scope of Work |
| Engineering Subcontractor performs detail design and installation engineering which comprise a wide range of activities like provision of personnel, project control, applying for approval of Classification Society, analysis, drawings, specifications and procedures. |
| Brief Description |
|
Client awarded to Contractor a contract for engineering, procurement, construction and installation of one 35km length of composite submarine power cable (33kv, 3x150mm2 conductors, 24 core fibre optic, 8 core control cable) between Resalat platform and Reshadat platform in LAVAN oilfield in Persian Gulf.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|