March 10, 2010              Login  
 
 
 
ProjectsCompleted ProjectsNew SWIP     
Installation Engineering of Sirri New Sea Water Intake Platform Minimize
 
Client/ Contractor: Iranian Offshore Oil Co. (IOOC) / SABA Co.
Scope of Work
Installation engineering, including:
  • Load out
  • Transportation and sea fastening
  • Pile installation
  • installation of topside
Brief Description

This section highlights the scope of work for the installation of the WHP Jacket.On arrival in the South Pars gas Field, jacket installation location, a pre-installation survey will be performed.The NEW SWIP platform is located 4 m far away of existing SWIP on jetty area of SIRRI Island in water depth variable from 12 m to 24 m. the NEW SWIP is transferred about 4 m in X direction and about 6 m in Y direction relative old SWIP. The platform installed on four 42” outside diameter piles.

 
 
Company News Minimize
 
 
 
Last News(RSS) Minimize
 
 
 
Related Links Minimize
 
 
 
  Copyright ® 2009 Saff-rosemond Co.   Terms Of Use  Privacy Statement